Quick answer: Yes. A stump grinder cuts below the soil line, so OHIO811 should be notified before the work starts. Ohio’s rule since June 9, 2026 is at least two working days of notice (not counting the day you call, weekends or legal holidays) and no more than 16 calendar days before digging. It is free: call 8-1-1 or 800-362-2764, or use e-dig at OHIO811.org.
Gas, electric, water and communication lines often run through the same part of the yard where a tree once stood. This guide explains how Ohio’s call-before-you-dig system works, what it does not cover, and who is supposed to make the request when you hire stump grinding by a crew that checks for utilities first. It is general information, not legal advice.
Do you need to call 811 before stump grinding?
Yes, treat stump grinding as digging. Ohio Revised Code 3781.25 defines excavation as using hand tools or powered equipment to move earth or other material in order to penetrate the ground. The law does not name stump grinding, but that is what a grinder does.
Shallow work still counts. The OHIO811 FAQ page says to notify even when you are not digging deep, because erosion, weather and grading change how far down a line sits. It gives tree planting, fences and mailboxes as examples of projects that need a request.
How does OHIO811 work?
OHIO811 is a notification center, not a locating crew. You tell it where and when the digging will happen, and it passes that on to the member utilities with lines in the area. Each utility then marks its own lines with paint or flags, sometimes through a contract locating service.
According to the OHIO811 homeowner page, you will need to give the address, where on the property the work is, the nearest cross street, the start date and the type of work. You get a confirmation email with a reference number. A second email, called Positive Response, shows each utility’s status. Check it before any digging starts.
How far ahead do you need to call?
At least two working days ahead, and no more than 16 calendar days. These numbers changed on June 9, 2026, when House Bill 227 took effect. Many older guides still show the previous rule of 48 hours and ten working days.
| Rule | What OHIO811 says |
|---|---|
| Minimum notice | Two working days, not counting the day you notify, weekends or legal holidays |
| Maximum notice | 16 calendar days before digging |
| When the request expires | If digging has not started within 16 calendar days, or if the marks are destroyed or removed |
| Phone | 8-1-1 or 800-362-2764. Routine requests Monday to Friday, 6 a.m. to 6 p.m. |
| Online | e-dig at OHIO811.org or the OHIO811 mobile app |
| Cost | Free |
As an example, a request made on a Monday gives the utilities Tuesday and Wednesday to respond, so Thursday is the earliest day to dig if no holiday falls in between. If the marks get mowed off or washed away before the job, OHIO811 says to notify again. That is also free.
What gets marked and what does not?
Utilities mark only the lines they own. Lines that belong to you are not marked. OHIO811’s private utility locating page lists these examples of privately owned lines:
- An electric line from the house to a garage or shed
- A water line to a pool
- A propane line to a grill
- Buried pet fence wire
- A sewer line to a septic tank
OHIO811 does not mention lawn sprinkler systems by name. If you have one, assume it will not be marked, and show the crew where the lines and heads are.
Service lines, which run from the street or pole to your house, may not be marked either. OHIO811 says a private locating company may be needed for both kinds, and its page lists member locators. Marks are also approximate. The tolerance zone is the width of the line plus 18 inches on each side, and OHIO811 calls for careful hand digging inside it.
Who makes the call: you or the crew?
Whoever does the digging makes the request. OHIO811 states that when you hire a contractor, the contractor must notify before work begins, and it cites Ohio Revised Code 3781.25(K) and 3781.28.
| Situation | Who notifies OHIO811 |
|---|---|
| You hire a company to grind the stump | The company. Ask for the confirmation number and the utility responses |
| You rent a grinder and do it yourself | You |
| You plant a new tree afterward | Whoever digs the hole |
Lead time affects scheduling more than cost. A grinding job cannot start the same day it is requested unless a valid ticket is already in place. For what the work itself runs, see stump grinding prices in Toledo. Filling the hole and replanting come next, and what to do after stump grinding covers that step.
Call before you dig Ohio FAQs
What is the call before you dig Ohio number?
Dial 8-1-1 or 800-362-2764. OHIO811 takes routine requests Monday to Friday from 6 a.m. to 6 p.m. and emergency calls around the clock.
Can I make a call before you dig request online in Ohio?
Yes. OHIO811 offers e-dig for homeowners working at a single address, available at OHIO811.org and in its mobile app. The app also shows Positive Response and nearby tickets.
My yard was marked last year. Do I have to call again?
Yes. OHIO811 says to notify before every dig, because construction, erosion, rain and drought can change a line’s depth. Old marks and old tickets do not carry over.
What if a line is hit during the work?
Stop, shut off the equipment and move everyone away. The OHIO811 safe digging page says to leave at once if you smell rotten eggs or hear hissing, and to call 9-1-1 first, then 8-1-1 or 800-362-2764. Do not try to repair anything yourself.
Sources
- OHIO811: Homeowners
- OHIO811: Frequently Asked Questions
- OHIO811: Private Utility Locating
- OHIO811: Press release on House Bill 227 changes effective June 9, 2026
- OHIO811: Homeowners, Call 811 Before You Dig
- Ohio Revised Code: Section 3781.25, definitions
- Ohio Revised Code: Section 3781.28, notice of excavation